Copying Construction Line Items Between Estimates
If you have enough RAM to open two estimating worksheets
at once, follow these steps:
1. Open both estimating worksheets by choosing Open File from the File
menu.
2. Bring the destination estimating worksheet to the front by choosing its name at the bottom of
the Window menu. If the worksheet is protected, choose Unprotect Document from the Options menu.
3. Scroll to the rows where you'd like to add the new item(s). If necessary, select the desired location and
choose Add Rows Here from the Edit menu to add some blank rows.
4. Bring the source estimating worksheet to the front by choosing its name at the bottom of the Window menu.
If the worksheet is protected, choose Unprotect Document from the Options menu.
5. Scroll to the rows that you would like to copy, and drag the mouse through them. Be sure to select all
of the worksheet columns-- the selection will be 11 columns wide.
6. Choose Copy from the Edit menu.
7. Bring the destination estimating worksheet to the front by choosing its name from the bottom of the Window
menu.
8. Click on the upper left corner of where the new item(s) should appear, then choose Paste from the Edit
menu.
NOTE: If the MacNail construction management
software asks you whether to 'use the existing definition of' some items, click OK for each item.
9. To move more items, repeat steps 3 to 8.
10. After you have copied and pasted all desired items, activate each estimating worksheet and choose Protect
Document from the Options menu.
11. Choose Save from the File menu to make the changes permanent.
|