Temporary Stair Treads

Construction Item Description

Construction unit cost for temporary stair treads for early construction phases. They'll be removed and replaced with a finished stairway later in the construction process.

Unit Size

One stairway.

Labor Costs

We figure about one hour to install the temporary treads.

Material Costs

We figure 42 lineal feet of 2x12 lumber (enough for 14 steps 3 feet in width). This unit cost is based on an 8 foot ceiling height. The labor and material costs are adjusted for different ceiling heights.

Suggested Quantity

No suggestion. Enter the number of stairways required.

Source of Construction Pricing

Based on job cost data and crew timing from Turtle Creek Construction.