hwh pad 2x3x4"
|
Construction
Category |
SubCategory |
Concrete |
Concrete Floor Slabs |
Construction ITEM DESCRIPTION |
Concrete estimating unit cost for a concrete pad
under a hot water heater-- size 2 ft x 3 ft x 4" thick.
This cost applies to a slab placed in
an unfinished (dirt floor) basement, or for a raised slab
poured on top of a regular basement floor slab. |
Labor
Costs |
We figure about a little less than
3/4 hour of labor-- part skilled and part unskilled.
|
Material
Costs |
The cost includes some forming lumber,
a bit of reinforcing mesh, and ready-mix concrete. Add
some time if you are mixing the concrete by hand.
|
Hard Construction Costs, Typical |
$26.56 for each hot water heater
base pad
|
Source
of Construction Pricing |
Based on job cost data for one project
done by Turtle Creek Construction.
|
Places Included |
Architect Starter File, Construction
Starter File, Developer Starter File
|
Comments |
The cost will be much higher if the
pad is the only work you're doing. The cost listed here
will apply only if you are including it in along with a
larger pour of a slab or footings. Add 1/2 to 1 hour of
setup and cleanup time if it's all you are doing!
Add about 1/2 hour for hand-mixed concrete
from bagged concrete mix,
or 3/4 hour if you are mixing
gravel, sand and portland
cement (9:3:1). |