![]() |
|
||||
Reposting Job Costs for One Project |
Problem cc posting entirely screwed up for one job, mismatch between ledger/ log and cost control worksheet. Wants to re-post everything to one or more cost control sheets in MacNail construction accounting software. Diagnosis When #s are hopelessly screwed up-- could be caused by: Solution 1. clear the cc column for that job in all Ledgers and Logs. Can use Sort
Special in any Log,
or Find in any Ledger or Log, to get to items for the job. Stress the desirebility of turning on the 'automatically save after posting' option in Job Cost Options. If it is on, the only possible way that cc posting can break is if it bombs or loses power in the middle of saving files at the end, a very unlikely (although not impossible) event. See also #360 for number mis-matches that aren't really errors Comments Entered 11/8/93 by Dennis. Updated 11/20/2010. |