![]() |
|
||||
Backhoe Foundation Excavating Cost |
Construction ITEM DESCRIPTION Construction unit cost for an easy foundation hole dug out by a backhoe. Unit Size One cubic yard of soil removed. Labor and Equipment Costs We figure 20 cubic yards of soil remove per hour of backhoe time (with operator), plus an hour of unskilled labor per 12 cubic yards of soil. Material Costs None included Suggested Quantity Goldenseal calculates foundation hole volume, based on the area and depth. You can adjust the quantity if a different amount of excavation is required (for example, on sloping ground). Source of Construction Pricing This is a "rule of thumb" price based on exact timing from one project. The price can vary quite a bit depending on project size, soil type, ease of access, season and other project details. You can replace this estimate with a firm subcontractor quote when you receive one. Places Included Architect Starter File, Construction Starter File, Developer Starter File. Comments Click here for more about Goldenseal construction estimating software. For other excavation estimating costs, click here. ![]() |
Directory | Previous | Next | Getting Started Manual | Reference Manual | Site Map | Website © 1987-2012 Turtle Creek Software |