
New & Used
Swiss Army Knives

New & Used
Leatherman Tools
Goldenseal Construction Estimating Software |
Assembly
name-- In Goldenseal Estimating Software |
undergrnd svc, 4/0 wire
|
Construction
Category |
SubCategory |
Rough Electric |
Electric Utility Hookups |
Construction ITEM DESCRIPTION |
Electrical estimating unit cost for installing
underground electrical service with 4/0 (0000) wiring.
|
Unit Size |
One lineal foot of 4/0 (0000) wiring.
|
Labor
Costs |
We figure an unskilled worker can install about
36 lineal feet of wiring per hour, plus a skilled supervisor or
electrician spending one hour per 100 feet of wiring.
NOTE-- This cost covers placement of the service
wire and covering with gravel. It does not include trenching
or backfill, or any wiring connections at the two ends.
|
Material
Costs |
One lineal foot of 4/0 (0000) gauge wiring with
an 8% waste factor, plus one ton of gravel cover for every 25 feet
of wiring.
|
hard
COnstruction Cost, Typical |
$2.99 per lineal foot
|
Suggested
Quantity |
No suggested quantity. Enter the length of underground
service wiring required.
|
Source
of Construction Pricing |
Based on crew timing from a few electrical installations
done by Turtle Creek Construction.
|
Places Included |
Architect Starter File, Construction
Starter File, Developer Starter File
|
Click here for more about Goldenseal construction estimating software.
Click here for other rough
electrical construction
costs.
 |
|